07 Nov,2024
i)Leave module done.table and sp done. ii)Check Leave master current date leave exists if not exists send mail and notification.
06 Nov,2024
i)Android version Changed.build error fixed. ii)Firebase to http v2 notification done in server side. iii)After published on server api not working fixed.changed framework self contained iv)netcore 2.1 to 3.1 moved. v)Android
05 Sep,2024
i)Subscription days show in master page done. ii)while login if subscription end show subscription.html.
08 Jul,2024
i)Excel log report show in ascending order done.date format changed as MM:dd:yy.
01 Jun,2024
i)Hanon gate out and gate in time calculation Changed in whole project done.Take gateout and gatein time from timing master instead of (targettime - gateout) (targettime - gatein)
31 May,2024
i)Timeslot master table done.excel template done. ii)Upload timeslot module done in web app. iii)Send notification and mail if gatein and gateout not done.(Timeslot)
29 May,2024
i)Menu list right over icon (box) removed. ii)customizer link box removed. iii)Show logged in username and role at right cornor done.(in login query role join added) iv)Alignment issue fixed. v)Version Control configured.
28 May,2024
i)chart line fixed.
27 May,2024
i)Log detailed report Changed.excel template done ii)Query Altered intime and outtime added.targetgateout and targetgatein calculation done. iii)Gate Entry module added remarks textbox.(show remarks when actual time is exceeds target time o
24 May,2024
i)themars mail config done.bcc added.(update version from 4.5 to 4.7.2)(No Android app)
23 May,2024
i)chart js and css files added on server. ii)Logged report added date column.
21 May,2024
i)Android app published on google paly store.(screenshot,image,appicon)
30 Apr,2024
i)chart time loading done. ii)dashboard order changed. Logic changed gate out and gate in time. iii)timing master done with gateout and msil gate in time.(add and update) iv)Hanon gate out and gate in time calculation done.(dynamicaly
29 Apr,2024
i)Gate in/out entry not saving data fixed.(added reason ) ii)Edit option added in all module. iii)dashboard data grid order and text changed. iv)chart not loading fixed.remove qty chart.
20 Mar,2024
i)Reason edit textbox show if time exceeds current time. show list created date descending order.
19 Mar,2024
i)Reason added in msail table, sp and api. ii)dashboard show actual gatein,gateout and reason (both company) iii)Reason is mandatory if time exceeds current time.
07 Mar,2024
i)web api db connection changed. ii)timing master isactive checked and ascending order done. iii)Dashboard manesar report gate-in not showing and bg color not reflect fixed.
13 Feb,2024
i)Dashboard module done.sp and api done. ii)List view changed. iii)new drawable done.adapter class done.
12 Feb,2024
i)Login module view changed.
08 Feb,2024
i)pass data from notification to activity done.while click on notification show data in opened view. ii)android 14 issue fixed. iii)timing id not store while save from notification data fixed. iv)show MSIL List module done.sp and api d
07 Feb,2024
i)Login module done.Api done. post and get issue ii)MSIL module done.sp and api done. iii)Notification integration done in client side. iv)Pending intent manual activity selection done. v)send notification with custom sound done.
06 Feb,2024
i)Mobile Application moved api 34.api config done. ii)api not working. postman installation done.
02 Feb,2024
i)upload option removed.gate in and out entry manual done. ii)report done with new data. iii)dashboard data updated.remove details table in query. remove qty from gridview. iv)alert popup tested.
24 May,2023
i)Alert and notification added company
10 May,2023
i)Gateintime show max of time in grid view. ii)Inwardqty show in grid
09 May,2023
i)Timing id string issue fixed. ii)Gate-in separate part done.
08 May,2023
i)Same inwardqty and partno merge cell. ii)Gateout upload sheet two times remove old data from db add new one.merge cell color changed.
06 May,2023
i)show Alert message left side Menu. ii)Gate in:get max time compare this time with timingmaster nearest value. iii)Monthly report done.Daily report done.(Partno gateout,itemcode gatein) iv)In Dashboard show GridData.if gateout and in
04 May,2023
i)read no.of sheet from excel upload sheet one by one.get company name from sheet name. ii)Bulk Planned data upload concept done. iii)Qty caluclated by timing master. iv)Gateout done.if despatch qty is not empty add gateout. v)Gatein
03 May,2023
i)Time complaince yaxis converted as decimal.show data. ii)Tab concept done.gurgan and manesar chart done. iii)DAshboard page show gatein,out and planned. iv)Qty Complaince color issue fixed.remove distribution from chart. v)REfersh p
02 May,2023
i)Upload,gateout,gatein excel upload format changed. ii)notification and mail send to higher officer time interval changed. iii)DAshboard data grid done.chart qty compliance done color issue present. time complaince y axis time not showing.
26 Apr,2023
i)Pagination and search option not showing fixed.
25 Apr,2023
i)Mobile login sp altered.instead of username login with empid. ii)Rolewise manual time done.get min from role table instead of manual entry. iii)Checked mail and notification rolewise.
24 Apr,2023
i)HOD role added.this role can access manager role. ii)Add time against company done. iii)REmove company dropdown from ENagare entry screen instead of tat get from timing master done. iv) add company name in mail and notification. v)E
17 Apr,2023
i)input string was not correct format issue fixed.
13 Apr,2023
i)Alter Notification not showing fixed.role wise send notification done. ii)Qty and dispatch qty mismatch send alter done. iii)Clear all notification in andoird app. iv)timemaster delete option done. v)SMS Gateway done.
11 Apr,2023
i)In DAshboard show uploaded time and date. ii)Send mail from timing master data.(instead of manual time) iii)Mobile App Login with firebase done. iv)Send notification and vibrate while receive mail.
10 Apr,2023
i)Time,company and user master module done. ii)send mail after 5.30 if data not present in table.
06 Apr,2023
i)User and nagaredetails table done.(sp with datatable done) ii)Import excel done.